earned value management jobs in 2026 — demand, top roles hiring, and related skills
As of 2026-11-21, earned value management appears in 338 job postings indexed by Skillenai over the past 90 days — Program Manager has the most postings mentioning earned value management.
Last updated · 90d ending 2026-11-21
Which roles want earned value management?
Upload your resume and Skillenai will show which roles your earned value management experience fits, which skills you already cover, and what is missing.
Frequently asked questions about earned value management
+Is earned value management in demand in 2026?
Yes. earned value management appears in 338 job postings indexed by Skillenai over the 90 days ending 2026-11-21. Program Manager accounts for the most postings mentioning earned value management (49.1% of all postings mentioning earned value management).
+What jobs require earned value management?
According to the Skillenai jobs index over the 90 days ending 2026-11-21, among roles with at least 20 postings, the highest shares mentioning earned value management are Material Program Manager (14.1% of that role’s postings mention earned value management), Systems Engineering Manager (9.3% of that role’s postings mention earned value management), Test Engineering Manager (8.9% of that role’s postings mention earned value management).
+What skills are commonly paired with earned value management?
Across job postings indexed by Skillenai (90 days ending 2026-11-21), earned value management most often appears alongside Risk Management, Agile, program management, project management, systems engineering.
+Where is earned value management most in demand?
As of 2026-11-21, the metro areas posting the most jobs requiring earned value management are Tucson, Woburn, Lone Tree, El Segundo, Berkeley, according to the Skillenai jobs index.
+How can I keep up with new earned value management content and jobs?
Skillenai indexes news, blog posts, and research papers mentioning earned value management alongside the jobs index. You can subscribe to a daily email digest of new earned value management content from your Skillenai account.
+Which skills come before and after earned value management?
The skill-flow chart shows skills documented in adjacent positions across observed employer changes. An outgoing skill is documented in the following position but not the preceding one. These are ideas to explore, not proven prerequisites, acquisition dates, or levels of mastery. Each ribbon counts employer moves with that skill pair; one move can contribute several pairs.
Weekly indexed postings requiring earned value management — last 90 days
Salary distribution
Box = 25th–75th percentile · tick = median · whisker = 10th–90th · USD, annualized
Career paths around earned value management
Skills documented before and after this skill across employer changes.
Historical career profiles · all locations
Skills before earned value management
Skills after earned value management
How to read this chart · view counts
Each side is an independent set of observed employer moves, not the same people followed through three stages. Ribbon widths compare move counts within that side. Internal moves are not included.
The following position documents a skill that the preceding position does not. Skills must be linked to both positions, with clear dates and no overlap. One move can connect several skill pairs. These patterns suggest skills to explore; they do not establish prerequisites, when a skill was learned, or a higher skill level.
Source: Skillenai talent graph, historical career profiles. Historical descriptions and coverage can change. Only the leading published connections are shown.
| Connection | Moves |
|---|---|
| Before: FAR | 2 |
| Before: Network Infrastructure | 1 |
| Before: DFARS | 1 |
| Before: BCAP | 1 |
| Before: live-fire testing | 1 |
| Before: SEO | 1 |
| Before: program management | 1 |
| Before: Capital Expenditure (CAPEX) Accounts | 1 |
| After: Earned Value analysis | 1 |
| After: ad hoc reporting | 1 |
| After: testing | 1 |
| After: maintenance requirements identification | 1 |
| After: DFARS | 1 |
| After: burn rate | 1 |
| After: Software Test Procedures | 1 |
| After: planning | 1 |
Roles most likely to require earned value management
Among roles with at least 20 postings in the same period.
| Role | Postings mentioning skill | % of role postings mentioning skill |
|---|---|---|
| Material Program Manager | 14 | 14.1% |
| Systems Engineering Manager | 8 | 9.3% |
| Test Engineering Manager | 4 | 8.9% |
| Operations Program Manager | 3 | 4.7% |
| RF Engineer | 1 | 4.3% |
| Engineering Program Manager | 5 | 3.8% |
| Deputy Program Manager | 2 | 3.8% |
| Integration and Test Engineer | 1 | 3.2% |
| Program Manager | 166 | 3.1% |
| Electrical Engineering Manager | 1 | 2.0% |
Roles with the most earned value management postings
| Role | Postings mentioning skill | Share of skill postings |
|---|---|---|
| Program Manager | 166 | 49.1% |
| Systems Engineer | 44 | 13.0% |
| Material Program Manager | 14 | 4.1% |
| Software Engineering Manager | 11 | 3.3% |
| Engineering Manager | 9 | 2.7% |
| Systems Engineering Manager | 8 | 2.4% |
| Engineering Program Manager | 5 | 1.5% |
| Product Manager | 5 | 1.5% |
| Technical Program Manager | 5 | 1.5% |
| Product Owner | 4 | 1.2% |
Top companies posting jobs requiring earned value management
Employers ranked by indexed job postings in the last 90 days.
| Company | Postings · 90 days |
|---|---|
| Northrop Grumman | 87 |
| Globalpr | 78 |
| Boeing | 21 |
| SNC | 12 |
| Voyager Technologies | 11 |
| Sierra Nevada Coporation | 10 |
| RTX | 10 |
| ADMS | 8 |
| GlobaliD | 7 |
| Karman Space & Defense | 6 |
Job postings indexed over the past 90 days, grouped by resolved employer. Counts are postings, not hires. Companies without a published page appear without a link.
Top metros hiring for earned value management
| Name | Postings | Share |
|---|---|---|
| Tucson | 26 | 7.7% |
| Woburn | 16 | 4.7% |
| Lone Tree | 15 | 4.4% |
| El Segundo | 8 | 2.4% |
| Berkeley | 7 | 2.1% |
| Cedar Rapids | 6 | 1.8% |
| Huntsville | 5 | 1.5% |
| Annapolis | 4 | 1.2% |
| Costa Mesa | 4 | 1.2% |
Skills commonly paired with earned value management
Explore related pages
- Material Program Manager
- Systems Engineering Manager
- Test Engineering Manager
- Operations Program Manager
- RF Engineer
- Engineering Program Manager
- Deputy Program Manager
- Integration and Test Engineer
- Risk Management
- Agile
- program management
- project management
- systems engineering
- Python
- MATLAB
- integrated master schedule
How this was computed
Weekly job-count charts omit the incomplete current week (weeks start Monday, UTC). Totals include all postings in the stated window. Counts derive from the Skillenai jobs index over the 90 days ending 2026-11-21. Skills are resolved against the Skillenai canonical taxonomy, so the same entity is counted whether a posting writes 'Python', 'Python 3', or 'python'. Role prevalence divides postings mentioning earned value management by all postings for each role in the same window, ranking roles with at least 20 postings. Role distribution divides each role’s earned value management postings by all earned value management postings, including postings without a role. Shares need not sum to 100% for the displayed roles. Pages refresh weekly (or daily for the top-50 most-requested skills). An adjusted trend is not shown because comparable posting coverage is insufficient.
- source
- Skillenai jobs index, deduplicated daily
- entity_id
- 3fa7f1d7f4ed63b3
- data_as_of
- 2026-11-21
- window_days
- 90